SA: Documents you’ll likely need (simple checklist)

A practical checklist of documents most owner-builders gather for planning, building approval, inspections and completion.

This is a general checklist — your council / building surveyor may require additional items.

In 60 seconds

  • Your approvals move faster when documents are consistent (site plan matches drawings, engineering matches structure).
  • Most owner-builders lose time on missing certificates late in the job.
  • Set up folders before you start (Planning / Building / Inspections / Trades / Completion).

Planning stage (if required)

  • Site plan (boundaries, setbacks, existing features)
  • Floor plans and elevations
  • Shadow diagrams (where required)
  • Stormwater / drainage concept (where required)
  • Any specialist reports triggered by overlays (bushfire, heritage, flooding, etc.)

Building approval stage

  • Construction drawings + specifications
  • Engineering (as applicable)
  • Energy efficiency / performance documentation (as required)
  • Soil test / footing design inputs (as required)
  • Planning conditions (if planning approval was required)

During construction (inspections & evidence)

  • Inspection schedule (written)
  • Inspection outcomes / sign-offs
  • Trade compliance certificates (electrical / plumbing etc.)
  • Photo evidence at each stage (before covering work)
  • Variations log (what changed, when, and why)

Completion pack (end of job)

  • Final approval / occupation documentation
  • All compliance certificates (compiled)
  • Warranties, manuals, receipts
  • As-built notes/photos (where services run)