SA: Record-keeping template (simple)

A lightweight record system for owner-builders in SA: approvals, inspections, photos, certificates, and variations.

Goal: make inspections and completion “boring” by having everything ready.

In 60 seconds

  • If you can’t prove it happened (inspection/certificate/photo), it becomes a delay later.
  • Record-keeping is mainly: approvals, inspections, trade certificates, variations.
  • Keep one simple structure from day one — don’t “sort it later”.

Simple folder structure (copy/paste)

Use Google Drive/Dropbox/OneDrive or a local folder. The point is consistency.

00 Admin
  - Contacts
  - Quotes & invoices
  - Payments
01 Approvals
  - Planning (if applicable)
  - Building approval / permit
  - Conditions & correspondence
02 Drawings & specs
  - Latest approved set
  - Superseded (old versions)
03 Engineering & reports
  - Soil report
  - Structural engineering
  - Other certifications
04 Inspections
  - Stage 1 (footings/slab)
  - Stage 2 (frame)
  - Stage 3 (waterproofing)
  - Stage 4 (final)
05 Trade certificates
  - Electrical
  - Plumbing / drainage
  - Waterproofing (if provided)
  - Termite / other
06 Variations & changes
  - Change log (date / what / why)
  - Updated drawings
  - Emails / approvals
07 Photos
  - By date (YYYY-MM-DD)
  - By stage (optional)

What to capture at each inspection stage

  • Before: photos of anything that will be covered (ties, membranes, penetrations, reinforcement, service runs).
  • During: inspector/surveyor notes, any rectification items, due dates.
  • After: outcome confirmation (email/report), photos of the rectification once done.
Common mistake
Relying on memory (“yeah we did that”) instead of keeping proof. End-of-job signoff is where this bites.