SA: Inspections (stages, hold points, evidence)

How inspections typically work in SA: what to prepare, what must stay visible, and how to avoid rework.

Your building surveyor sets the required stages for your project — confirm your written schedule early.

In 60 seconds

  • Inspections are hold points: don’t cover work until it’s inspected (and/or documented as required).
  • Book early — delays often happen because people assume next-day availability.
  • Keep photos + certificates as you go. End-of-job “scramble” is the #1 cause of completion delays.

Typical stages (varies by project)

Early
  • Footings / excavation / reinforcement
  • Slab (pre-pour) / subfloor elements
  • Frame
Mid to late
  • Waterproofing (before tiling/covering)
  • Services evidence (trade certificates)
  • Final inspection / completion stage
Key rule
If it will be hidden later (waterproofing, framing connectors, service penetrations), assume it needs inspection or documented evidence.

What to do (simple system)

  1. Get a written inspection schedule from your building surveyor.
  2. Before each stage: confirm what must be visible and what documents are needed.
  3. Create a folder per stage: photos + notes + outcomes.
  4. Log any rectification items and close them out with evidence.