SA Guide

SA: Completion & occupation approval

What “completion” means in practice: final inspections, evidence packs, and the documents typically needed before lawful occupation.

Requirements vary by project. Your building surveyor/certifier is the best source for what’s required for your final sign-off.

In 60 seconds

  • “Done” means the final inspection is passed and the required paperwork is in.
  • Most delays at the end happen because documents are missing, not because the house is unfinished.
  • Start building your evidence pack early (it’s painful to rebuild later).

Completion checklist (practical)

  1. Confirm the final inspection list with your building surveyor/certifier (what must be complete and visible).
  2. Finish all “must-have” items that block sign-off (safety, services, required fixtures).
  3. Collect trade certificates (electrical, plumbing/drainage, and any others relevant to your project).
  4. Collect engineering / specialist sign-offs if applicable (structural, truss, retaining, etc.).
  5. Prepare as-built documentation if needed (changes made during construction).
  6. Book the final inspection early (end-of-build schedules fill fast).
  7. Rectify defects identified at final inspection and provide proof.
  8. Receive the final outcome (whatever your project’s completion/occupation documentation is).

Evidence to collect (build your “final pack”)

Core docs
  • Approvals/permits + conditions
  • Inspection outcomes
  • Plans/specs (final version)
Certificates
  • Electrical certificates
  • Plumbing/drainage certificates
  • Any specialist certificates required
Photo evidence
  • Before covering membranes/services
  • Key structural stages
  • Rectification proof
Manuals & warranties
  • Appliances/systems manuals
  • Warranty documents
  • Receipts and model numbers