Documents you’ll likely need (QLD)
A practical checklist so you don’t get stuck mid-way through approvals.
1) For the QBCC owner-builder permit
- Evidence of course completion (or exemption), as required
- Site/address details (lot/plan), owner details
- Rough scope summary + value estimate (trade price style, not “mates rates”)
2) For planning (council), if required
- Site plan (boundaries, setbacks, existing structures)
- Concept plans/elevations for assessment
- Overlay-specific reports (if applicable): flood/bushfire/heritage, stormwater, etc.
3) For certifier/building approval, inspections & final
- Full construction drawings + engineering (where required)
- Energy efficiency / compliance documentation
- Inspection certificates during the build (commonly Form 16 stage certificates)
- Final certificates at the end (e.g. Form 21 for certain detached class 1a/class 10 work)
Practical rule
Build a single “job folder” on day one. Each inspection/certificate goes in immediately — not at the end.
Official sources
Want a guided version?
Create a free account to save your project details (coming soon).
Free account