In 30 seconds
- A planning permit is about land use and neighbourhood controls.
- A building permit is about construction compliance and safety.
- You may need both, or only a building permit — depending on the project.
- Getting them in the wrong order is a common (and expensive) mistake.
What is a planning permit?
A planning permit is issued by your local council and controls how land can be used and developed.
It focuses on neighbourhood and policy impacts — not construction details.
- Zoning restrictions
- Overlays (heritage, vegetation, flooding, etc.)
- Building height, setbacks, site coverage
- Neighbourhood character considerations
What is a building permit?
A building permit authorises construction work to start and confirms the work complies with the Building Act, Building Regulations, and NCC.
In Victoria, building permits are issued by a registered building surveyor — not council (unless the council also provides surveying services).
- Structural adequacy
- Fire and safety provisions
- Health and amenity requirements
- Mandatory inspection stages
How they work together
- Confirm whether a planning permit is required
- If required, obtain planning approval first
- Prepare construction documents consistent with planning conditions
- Apply for a building permit
- Start work only after the building permit is issued
Common mistakes owner-builders make
- Assuming a building permit means planning approval isn’t needed
- Designing in detail before checking planning controls
- Applying for a building permit before planning conditions are resolved
- Starting work before the building permit is issued
Where this fits in the VIC owner-builder process
- Decide if owner-building is suitable
- Confirm Owner-Builder Certificate of Consent (if required)
- Work out planning permit requirements
- Appoint a building surveyor and obtain a building permit