TAS Deep Dive

Record Keeping (Tasmania)

In Tasmania, final approvals and sign-offs depend on what you can prove, not just what you remember. Record keeping is the backbone of a smooth owner-builder project.

In 30 seconds: what to keep

  1. Approved plans + CLC + building permit conditions
  2. Inspection bookings + stage sign-offs
  3. Trade compliance certificates (electrical, plumbing, waterproofing)
  4. Engineering certificates / reports
  5. Photos of hidden work before covering
  6. Variation log (what changed + who approved)

Why record keeping matters (TAS context)

Your building surveyor relies on documentation when assessing compliance at mandatory notification stages and at completion.

Projects stall because:
  • Certificates were never collected
  • Changes weren’t documented
  • Photos weren’t taken before covering work
  • No one can prove what was installed

Simple folder system (minimum viable system)

/Approvals
    - Planning permit
    - CLC
    - Building permit

/Inspections
    - Footings
    - Frame
    - Waterproofing
    - Final

/Certificates
    - Electrical
    - Plumbing
    - Waterproofing
    - Engineering

/Photos
    - Footings
    - Framing
    - Services before lining
    - Waterproofing membrane

/Variations
    - Variation log
    - Updated drawings
Tip
Name photo files with the date + stage (e.g., 2026-03-14-footings-rebar.jpg).

Variation log (keep it simple)

Variations aren’t bad — undocumented variations are.

Basic template
  • Date of change
  • What changed
  • Reason
  • Who approved (surveyor/engineer/trade)
  • Updated drawing reference (if any)

What blocks completion approval

Missing trade certificates
Especially electrical and plumbing.
Unapproved structural changes
Even “minor” changes can require documentation.
No waterproofing evidence
Wet areas are a common delay point.
Incomplete inspection history
All mandatory stages must be signed off.